Custom Steel Window and Door Specification & Ordering Process for Architects

One project, one team, from first sketch to delivery.

PINKYS custom Studio Steel windows and doors are made to order, drawn from the project and released to production only once the drawings are signed. Here is how the process runs and how long it takes.
Pinkys los angeles showroom with steel double doors and top windows
  1. Showroom visit. Optional, and the fastest way to settle profiles, glazing and finish.
  2. Design consultation. Design intent reviewed against what each system can carry.
  3. Proposal and accuracy check. Dimensions, operation, glazing and finish confirmed against the project documents; the deposit releases the project to drafting.
  4. Drafting and review. CAD drawings for every opening, revised against your comments.
  5. Signature. Once the full set is signed, the order enters production and no further changes are allowed.
  6. Manufacturing. 14 to 16 weeks from signed drawings.
  7. Delivery and support. Shipping typically takes about two weeks, up to three to the East Coast, with installation support for the contractor.

Specification moves faster once the product has been seen in person. The PINKYS Los Angeles flagship in Vernon, designed by Jeremiah Brent, displays every profile system with its corner sections, operable doors and a working lift-and-slide system, alongside custom gothic arch windows, steel-framed partitions and the full range of Rocky Mountain Hardware finishes.

Visits are by appointment. Bring the plans and opening dimensions, and the Studio Steel team will review the project on site. Specific products or configurations can be prepared in advance on request.

side shot of pinkys showroom steel wall panel
rocky mountain hardware and lock display in pinkys los angeles flagship showroom

PINKYS is best engaged during schematic design, while opening sizes and configurations remain open. The Studio Steel team reviews design intent against what each system can carry and identifies configurations that need rethinking before they reach the drawing set, where changes cost far less than at submittal. Curved and arched heads, oversized pivots, full bi-fold walls and interior partitions are all within scope, with maximum sizes confirmed by profile system and glazing.

Recommended documents include floor plans and elevations, an opening schedule, the energy compliance path, and structural requirements from the engineer of record. Documents can follow as the design develops, though a project that arrives with final dimensions and selections can often be drawn in a few days.

Shop Drawings

Every opening gets architecturally detailed CAD drawings, drawn to its actual dimensions, issued for review, revised against comments and reissued for signature. Drawings are issued as PDFs.

Drafting time depends on the project's size and how settled the design is. A project with final dimensions and selections can be drawn in a few days, and revisions typically return within three to five business days.

Before signing, the contractor or installer verifies every dimension and installation type against site conditions. PINKYS builds to the dimensions on the signed drawings.

ElementWhat it shows
ElevationsOutside and inside views, overall size, lite divisions and panel widths
Section cutsKeyed sections through frame, jamb, threshold and meeting points
Specification blockAround twenty fields per unit: design, size, jamb, threshold, mounting, active leaf, swing direction and pattern, finish, glass, lock, handle and location, stay, roller catch, screen, thermal break, hinge, bore holes
GlazingUnit makeup by layer, such as 5+12A+5, with coating and lite type
HardwarePart numbers, locations and bore hole positions
DimensionsMillimeters with inches bracketed throughout, so the drawing reads easily in either unit of measurement
Packing schedulePackage counts by component, for whoever receives the delivery
Approval blockSignature line. The approved drawing supersedes estimates, invoices and any prior correspondence

If any drawing needs revising, reject the set and contact your sales representative rather than signing. Once signed, no further changes are allowed.

ottostumm tb w50 steel corner rendering
PINKYS_16.jpg

Performance & Compliance

RequirementStudio Steel
EnergyThermally broken systems NFRC certified; Ottostumm W50 TB as low as U-0.21 (fixed) and U-0.31 (casement). Data supplied for energy modelers. See NFRC Ratings and Title 24 Compliance.
ImpactFlorida Product Approval for large and small missile impact on select products, with more in progress. See Impact & Hurricane Ratings.
GlazingTempered as standard; laminated and triple pane by profile system. See Glass Options.
StructuralFabricated to the loads and anchoring specified by the engineer of record.

Units are built to the signed drawings, finished through the eight-stage coating system, glazed and inspected before packing, whether the order is one opening or several hundred. PINKYS ships nationwide on its own trucks and flatbed carriers.

Deliveries are curbside, and the project team provides labor to offload. Any damage must be reported to PINKYS within three days of delivery to qualify for the claims process. Store units according to the PINKYS storage instructions, since improper storage voids the warranty.

PINKYS does not install, but provides installation guidance in English and Spanish. A dedicated support team works with the installing contractor through completion, and field questions go back to the team that drew the project.

Production takes 14 to 16 weeks and begins when the shop drawings are approved and signed, not when the deposit is made. Shipping follows, typically about two weeks and up to three to the East Coast.

The deposit releases the project to drafting. During drafting, the drawings are reviewed and adjusted until they are ready for signature, a stage that can take days or weeks depending on the project. Because production doesn't begin until the drawings are signed, completing review promptly keeps the overall schedule on track.

Frequently Asked Questions

During schematic design, while opening sizes and configurations remain open. Confirming what each profile system can carry at that stage shapes the drawing set rather than revising it later.

Floor plans and elevations, an opening schedule, the energy compliance path, and structural requirements from the engineer of record. Documents can follow as the design develops, though a complete set early reduces revisions later.

It depends on the project's size and how settled the design is. A project with final dimensions and selections can be drawn in a few days, and revisions typically return within three to five business days.

Production takes 14 to 16 weeks from signed shop drawings, and shipping typically adds about two weeks, up to three to the East Coast. Consultation, drafting and review come first, so the overall timeline depends on how quickly the drawing set is settled.

At signature, not at deposit. The deposit releases the project to drafting, and production begins only once the shop drawings are approved and signed, so drafting and review come before the 14 to 16 weeks rather than inside it.

Elevations, keyed section cuts, a specification block of around twenty fields per unit, glazing makeup by layer, hardware part numbers and bore hole positions, a packing schedule and an approval block for signature. Dimensions run in millimeters with inches bracketed.

No. Signed drawings release the order to production, and no further changes are allowed. Review every drawing before signing, and if anything needs revising, reject the set and contact your sales representative instead of signing.

The contractor or installer verifies field dimensions before the drawings are signed. PINKYS builds to the dimensions on the signed drawings, so every dimension and installation type should be checked against site conditions first.

Elevations, keyed section cuts, a specification block of around twenty fields per unit, glazing makeup by layer, hardware part numbers and bore hole positions, a packing schedule and an approval block for signature. Dimensions run in millimeters with inches bracketed.

Shop drawings are issued as PDFs.

Architecturally detailed shop drawings for every opening, issued for review, revised against comments and reissued for signature. Product data, NFRC data, finish samples and profile samples can be provided on request, depending on the project.

Every assembly is drawn from the project documents, including curved and arched openings, oversized pivots, full bi-fold walls and interior partitions. Maximum sizes depend on the profile system and glazing, and are confirmed during specification.

No. Studio Steel does not carry design pressure or structural ratings. Assemblies are fabricated to the loads and anchoring details specified by the project's engineer of record, who confirms the structural performance of each opening.

No. PINKYS provides installation guidance in English and Spanish, and a dedicated support team works with the installing contractor from delivery through completion.

Yes. The PINKYS flagship in Vernon displays every profile system with its corner sections, operable doors, a working lift-and-slide system, custom gothic arch windows, steel-framed partitions and the full range of Rocky Mountain Hardware finishes. Visits are by appointment.

The same PINKYS Studio Steel team, from the first design conversation through delivery. PINKYS has made steel and iron doors and windows in Los Angeles since 1978, and remains a multigenerational, family-owned and operated business.
Ottostumm w20 CAD

Start your specification.

Share the opening dimensions, configuration, and glazing requirements. PINKYS produces architecturally detailed CAD drawings and works through the specification one on one. The PINKYS Studio Steel team handles the rest.

Book a Consultation
Live Chat
Need help? Ready to buy?
Chat with a PINKYS specialist now!
Call Us 1-844-843-6677
Mon - Fri: 8 AM - 5 PM
Sat: 11 AM - 2 PM
Email Us
Need more info or got a question?
Send us a message!